Terms of Use
|
Privacy
|
Sitemap
|
Design
© SPEC Group 2009
  • Home
 
  • About Us
    • SPEC Group
    • CWES
    • Superior Engineering
  • Services
    • Structural Detailing
    • Drafting Services
    • Engineering Design
    • Workplace Health & Safety
  • Recent Projects
    • Biodiesel Waste Water Treatment Plant
    • Foundry Moulding Line Upgrade
    • Recycled Water Treatment Plant
    • Hazardous Area Processing Facility
    • Potable Water Pumping Station
  • Contact Us
    • Head Office
    • Employment
    • Online Enquiry
 
Recycled Water Treatment Plant

Project: Recycled Water Treatment Plant
Description:

Design, supply and install process pipe work and equipment for a Potable Recycled Water Treatment Plant at the Bendigo Waste Water Treatment Plant


Project & Design Requirements:

• Design and installation of pipe racks and pipe supports
• Full responsibility for all mechanical construction and installation works
• Transformation of Greenfield site
• Minimisation of environmental impacts
• Short timeframe for project establishment and completion
• Design and supply of Inspection and Test Plans
• Full compliance with OH&S legislative requirements
• Material procurement responsibilities
• Sub contactor tendering and selection
• Supply and installation of process pipe work (Schedule 80 uPVC and 316SS)
• Ad-hoc design and resolutions for economical construction methods
• Provision of lagging and cladding services for caustic pipework
• Provision of Commissioning technicians
• Preparation of project schedules
• Site inspections
• Continuous liaison and consultation between all contractors and client
• Provision of ongoing and continuous engineering support for all construction activities

                          